Mercedes S-Class W-140

1991-1999 of release

Repair and operation of the car



Mercedes S-Class
+ Mercedes-Benz cars of the class S (W-140)
+ Operation manual
+ Routine maintenance
- Engine
   Check of a compression in engine cylinders
   Check of the engine by means of the vacuum gage
   Belt of the streaming drive of auxiliary units
   + 6-cylinder petrol engines (M104.944 and M104.990/994)
   + 8-cylinder petrol engines (M119.970/981 and M119.971/981)
   - 12-cylinder petrol engines (M120.980/982)
      The air cleaner - installation details
      Covers of heads of the block of cylinders
      Removal and installation of the inlet pipeline
      Removal and installation of a final collector
      The valve of recirculation of the fulfilled gases - installation details
      Air supply pump
      Removal and installation of the top forward covers
      Heads of the block of cylinders
      Removal and installation of a cover of a chain of the GRM drive
      Replacement of a chain of the GRM drive
      The GRM drive - the general information, service of components
      Natyazhitel of a GRM drive chain
      Camshaft regulator
      Removal and installation of camshafts
      Check of phases of gas distribution
      Check and adjustment of position of camshafts
      Replacement of the directing plugs of valves
      Measurement of diameters of cylinders
      Removal and installation of pistons
      Check of rods
      Removal and installation of a bent shaft
      Removal and installation of the pallet of a case of the engine
      The oil level sensor switch - installation details
      The oil pump - a design and details of installation
   + 6-cylinder diesel engines (OM603.971)
   + 6-cylinder diesel engines (OM606.961)
+ Cooling systems, heating
+ Power supply system and release
+ Engine electric equipment
+ Gear shifting box
+ Automatic transmission
+ Coupling
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


79c5991e

Removal and installation of a final collector

Forward left final collector

Details of installation of a back right final collector (the left forward is established specularly)

12 — Samokontryashchiyesya of a nut
156b — the Forward left final collector
156/2 — Laying


 PERFORMANCE ORDER

At installation replace самоконтрящейся nuts (12) and, if necessary, laying (156/1).

Forward right final collector

Details of installation of a back left final collector (the right forward is established specularly)

12 — Samokontryashchiyesya of a nut
156d — the Forward left final collector
156/1, 156/2 — Laying


 PERFORMANCE ORDER

1. For removal of a forward right final collector remove the generator, the air pump, weaken fastening and fix sideways the directing pipe of the index of level of oil, disconnect an air supply tube on a head of the block of cylinders and fix it sideways.
2. At installation replace самоконтрящиеся nuts (12) and, if necessary, laying (156/1) and (156/2).

Back left final collector

Details of installation of a back left final collector (the right forward is established specularly)

12 — Samokontryashchiyesya of a nut
156d — the Forward left final collector
156/1, 156/2 — Laying


 PERFORMANCE ORDER

1. For removal of a back left final collector it is necessary to disconnect the following elements: a forward left final collector, the electronic drive of management of a butterfly valve together with the case of a butterfly valve, the valve of recirculation of the fulfilled gases. Turn off a bolt of fastening of the left support of the engine.
2. At installation replace самоконтрящиеся nuts (12) and, if necessary, laying (156/1) and (156/2).

Back right final collector

Details of installation of a back right final collector (the left forward is established specularly)

12 — Samokontryashchiyesya of a nut
156b — the Forward left final collector
156/2 — Laying

 PERFORMANCE ORDER

1. For removal of a back right final collector it is necessary to disconnect the following elements: a forward right final collector, the electronic drive of management of a butterfly valve together with the case of a butterfly valve, the valve of recirculation of the fulfilled gases. Turn off a bolt of fastening of the left support of the engine.
2. At installation replace самоконтрящиеся nuts (12) and, if necessary, laying (156/2).